1. Home
  2. iSQI
  3. CTAL-TAE Exam Questions

Free CTAL-TAE Exam Questions - iSQI CTAL-TAE Exam

iSQI CTAL-TAE Exam

ISTQB Certified Tester Advanced Level, Test Automation Engineering

Total Questions: 40

iSQI CTAL-TAE Exam - Prepare from Latest, Not Redundant Questions!

Many candidates desire to prepare their iSQI CTAL-TAE exam with the help of only updated and relevant study material. But during their research, they usually waste most of their valuable time with information that is either not relevant or outdated. Study4Exam has a fantastic team of subject-matter experts that make sure you always get the most up-to-date preparatory material. Whenever there is a change in the syllabus of the ISTQB Certified Tester Advanced Level, Test Automation Engineering exam, our team of experts updates CTAL-TAE questions and eliminates outdated questions. In this way, we save you money and time.

Do Not Fall for Cheap and Old iSQI CTAL-TAE Exam Questions

Study4Exam offers Premium High-Quality Exam Questions

Find out what will be covered on the exam and how it will be presented so you can prepare adequately. You can better prepare for the iSQI CTAL-TAE exam by familiarizing yourself with the types of questions and topics covered on the exam. Don't squander your time studying irrelevant material; instead, focus on what will be on the actual Advanced Level Test Automation Engineer exam.

Not Just Questions - Get Real iSQI CTAL-TAE Exam Experience

Create a schedule that allows you to devote sufficient time each day to studying for the ISTQB Certified Tester Advanced Level, Test Automation Engineering exam. Try to cover the complete syllabus of the Advanced Level Test Automation Engineer exam. Do a self-assessment of preparation to know your weak spots. Fill these gaps in your preparation with our preparatory material and ace your exam on the first attempt.

iSQI CTAL-TAE Questions

Q1.

Assume that you are the TAE responsible for the correct functioning of a TAS, deployed in a test environment that consists of a few machines running the same version of the operating system. The TAS has been working and stable since its deployment, it has been used to run an automated test suite consisting of many similar automated test. The infrastructure team is planning to update the operating system on these machines by installing a new the service pack for security reasons. Since the vendor of the operating system assurance full backward compatibility, the infrastructure team assurance that there will be no impacts on the functioning of the TAS.

What is the BEST approach to confirm the correct functioning of the TAS in this scenario?

Q2.

Consider A TAS for testing a desktop application via its GUI. All the test cases of the automated test suite contain the same identical sequences of steps at the beginning (to create the necessary objects when doing a preliminary configuration of the test environment and at the end (to remove everything created --specifically for the test itself during the preliminary configuration of the test environment). All automated test cases use the same set of assertion functions from a shared library, for verifying the values in the GUI fields ( e.g text boxes).

What is the BEST recommendation for improving the TAS?

Q3.

Consider a TAS that uses a keyword-driven framework. The SUT is a web application and there is a large set of keywords available for writing the automated tests that relate to highly specific user actions linked directly to the GUI of the SUT. The automated test written with the keywords are statically analyzed by a custom tool which highlight's repeated instances of identical sequence of keywords. The waiting mechanism implemented by the TAS for a webpage load is based on a synchronous sampling within a given timeout. The TAS allows checking a webpage load every seconds until a timeout value

Q4.

You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11th test. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.

What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11th test?

Q5.

Your goal is to verify completeness, consistency and correct behavior of an automated test suite. The TAS has been proven to successfully install in the SUT environment. All the preliminary checks to verify the correct functioning of the automated test environment and test tool configuration, installation and setup have successfully completed.

Which of the following is NOT a relevant check for achieving your goal in this scenario?

Solutions:
Question: 1 Answer: D
Question: 2 Answer: A
Question: 3 Answer: B
Question: 4 Answer: C
Question: 5 Answer: D

Limited Time Offer

50%

Off

Get Premium CTAL-TAE Questions as Interactive Practice Test or PDF

Get Full Access for iSQI CTAL-TAE questions with 50% exclusive Discount

Get All Questions

Note: If you see any error in these iSQI ISTQB Certified Tester Advanced Level, Test Automation Engineering questions or answers, get in touch with us via email: support@study4exam.com.

CTAL-TAE Valid Dumps | Advanced Level Test Automation Engineer Exam Questions

CTAL-TAE Exam Details

CTAL-TAE Exam Syllabus

Disscuss iSQI CTAL-TAE Topics, Questions or Ask Anything Related

Currently there are no comments in this discussion, be the first to comment!