BICSI DCDC-003.1 Exam Syllabus

Start Free DCDC-003.1 Exam Practice After Reviewing the Topics

Before starting your DCDC-003.1 exam preparation, it is recommended to review the complete BICSI Data Center Design Consultant exam syllabus and carefully go through the exam objectives listed below. Once you understand the exam structure and objectives, you should practice using our free DCDC-003.1 questions. We also provide premium DCDC-003.1 practice test, fully updated according to the latest exam objectives, to help you accurately assess your preparedness for the actual exam.

Vendor
DCDC-003.1
Exam Code
161
Total Questions
6
Total Exam Domains

START FREE DCDC-003.1 EXAM PRACTICE

NO SIGNUP REQUIRED  •  100% FREE TO START

DCDC-003.1 EXAM QUESTIONS

BICSI DCDC-003.1 Exam Objectives

Section 1: Concept Planning & Analysis
Weight:
30%
  • Conduct a needs assessment with client to determine their objectives, operational needs, and suitability of data center model (e.g., cloud, colocation, on-premise build, availability class requirements) needed for the end user for a new data center construction or existing data center
  • Identify future growth of data center (project phasing, shell space)
  • Conduct site research or survey to collect necessary information and site circumstances (e.g., to confirm topography, adjacent areas, comparison of multiple sites)
  • Collect risk/benefit factors for natural environment to determine impact on the data center
  • Collect risk/benefit factors for the utility environment to determine impact on the data center (e.g., availability and cost of power, telecommunications infrastructure, water, gas)
  • Determine financial implications (e.g., cost, tax incentives) of site selection and cost
  • Evaluate how well potential site(s) met criteria to determine overall appropriateness of site
  • Develop feasibility report based on client requirements and site evaluation and selection of search findings
Section 2: Systems: Architectural and Space Design/Mechanical/Electrical
Weight:
20%
Architectural and Space Design 
  • Design space based upon client requirements and feasibility analysis to ensure functionality of a complete data center
  • Apply IT equipment capacity and space requirements to the space design in order to ensure suitable layout of IT equipment
  • Apply ancillary systems space requirements (e.g., fire protection system, security, building automation) to determine the total impact on architectural space design
  • Determine personnel requirements to ensure proper functionality and safety of the data center
Determine physical security requirements to ensure proper security of the data center
Determine support area/space needs and adjacencies as required by data center functions

Mechanical Systems
  • Identify site utility requirements (e.g., water use/storage, fuel storage, gas use, sewer, storm water) that may impact the data center availability and overall detailed design
Electrical Systems
  • Identify site utility requirements (e.g., medium voltage, underground, overhead) that may impact the data center availability and overall detailed design
  • Coordinate client's power systems criteria (e.g., backup systems, distribution systems, voltage criteria) with electrical engineer to verify design meets the client's design intent
Section 3: Systems: Information Technology/Ancillary Systems/Communications Connectivity
Weight:
20%
Information Technology (Network, Storage, & Servers)
  • Identify information technology site requirements (e.g., equipment, standards, facility layout) that may impact the overall detailed design
  • Coordinate client's information technology criteria (e.g., cabinets, racks, SAN, stand-alone equipment, network requirements, physical systems/network security) with other discipline designers to verify design meets the client's design intent
Ancillary Systems (Fire Protection, Physical Security, Building Automation Systems [BAS])
  • Identify ancillary systems site requirements (e.g., fire protection, physical security, building automation systems) that may impact the data center availability and overall detailed design
  • Design space based upon client requirements and feasibility analysis to ensure functionality of a complete data center
  • Coordinate client's ancillary systems criteria (e.g., fire protection, physical security, building automation systems) with other discipline designers to verify design meets the client's design intent
Communication Connectivity
  • Identify site communications requirements (e.g., fiber, copper, pathways) that may impact the data center availability and overall detailed design
  • Coordinate IT stakeholders communications criteria (e.g., fiber, copper, pathways) with RCDD and other discipline designers to verify design meets the client's design intent
Section 4: Data Center Operations and Maintenance Assessment
Weight:
10%
  • Conduct optimization study to ensure data center meets client goals or requirements
  • Assess current system state of data center (e.g., mechanical, electrical, ancillary)
  •  Assess current efficiency of data center systems (e.g., mechanical, electrical, ancillary)
  • Assess current capacity and growth capacity level of data center
  • Assess the ongoing performance of the data center (e.g., performance, utilization, capacity)
  • Assess aging of all technologies and need for refresh
  • Assess utilities (e.g., availability and cost of power, telecommunications infrastructure, water, gas)
  • Assess physical security of data center (e.g., electronic systems, architectural security, bollards)
  • Assess operational performance (e.g., personnel, policies, maintenance operations procedures)
  • Assess data center's suitability against client's IT requirements (e.g., network, disaster recovery plan [DRP])
  • Assess operations documentation (e.g., historical commission reports, logs, DCIM)
  • Assess safety procedures (e.g., lock out/ tag out procedures)
  • Develop report that captures findings from assessment
Section 5: Security Assessment
Weight:
10%
Manage threat assessment (identification, frequency, impact)
  • Participate in the performance of a security audit (building inspections, security surveys, security analysis)
  • Verify audit findings against the security assessments objectives (ascertain security status, current state, protection levels)
  • Identify countermeasures (physical, electronic, organizational)
  • Coordinate cost/benefit analysis, feasibility, and/or present value studies
  • Translate client's DRP requirements into recovery design recommendations
Section 6: Construction Administration & Commissioning
Weight:
10%
Construction Administration
  • Assist client in overall bid process and award
  • Assist client or contractors with coordination during construction phase
  • Assist client or contractors with coordination during project close-out phase
Commissioning
  • Assist client with pre-commissioning activities to verify the commissioning tests meet the project design requirements
  • Assist client or commissioning agent in the development of the commissioning plan
  • Assist client or commissioning agent in execution of commissioning activities to verify the commissioning test results have met the project design intent